← Home

Order constraints

What we need to quote and build your boards, how an order moves through production, and what our turn times mean.

The deal

1–3 daysQuick turn
3–5 daysStandard turn
5–N daysLonger turn, as quoted

We commit to the last day in the quoted range. We almost always ship by the first day. These are business days; weekends and holidays do not count. The timer starts the morning after the complete kit arrives at our facility. When capacity allows, we may ship a 1–3 day order on the same day the kit arrives.

We prefer to order your bill of materials (BOM). We include a small amount of attrition, meaning extra parts for assembly loss. Our custom feeders and small-batch process keep that overage low. You may consign hard-to-source parts or parts you already hold.

Defects are rare, but they can happen. We resolve them case by case according to the order scope and defect severity. Past resolutions include a partial or full refund for an affected board, return for rework, or credit toward a future order.

Order process

  1. Send your quote packet: IPC-2581 XML, BOM and position CSV files when needed, Gerbers, and optional source files.
  2. We send a quote. You approve it; we then send an invoice.
  3. You pay the invoice and order the PCBs and stencil.
  4. We activate the order and give an initial production date with a ±2-day window. We order the BOM.
  5. We receive the complete kit: PCBs, stencil, and all parts. We narrow and confirm the production schedule.
  6. We assemble and ship your order.

Please send your packet and any order questions to orders@eightamps.com.

Quote packet

Build requirements

PCB design

Fabrication and stencil

Materials and components

We are exercising our material-handling tools and workflows and currently hand-place parts for many small, fast-turn builds.

We prefer to purchase parts for you, usually from DigiKey, then Mouser, Arrow, or the manufacturer when needed. We bill parts at cost plus shipping, with a small fee (usually 5%-10%) to cover tariffs that are not quoted over APIs. Check with us if you have hard-to-source parts or inventory you want to hold for future orders.

Consumables

We use lead-free SAC305 solder paste. The paste depends on how we apply it:

Stencil printing

Loctite / Harimatec GC-10 or Indium 10.1HF

GC-10 data sheet (PDF) Indium 10.1HF data sheet (PDF)

Dispensing

Indium 8.9HF

Indium 8.9HF data sheet (PDF)

Bottom-side adhesive

Chip Quik AD1-10S holds components on the bottom side of double-sided boards during reflow.

Chip Quik AD1-10S data sheet (PDF)

We cannot use leaded solder in our current facility. Ask us about other chemistries. We currently use Neoden IN6 reflow ovens.

Shipping

One outbound shipment is included per order: next-day air for 1–3 day orders; second-day air up to $100 for 3–5 day orders; and ground up to $50 for 5–10 day orders. For longer turns, remote destinations, unusually large, heavy or expensive boards, the quote may specify additional shipping fees.

Changelog

Questions about a build? Email Eight Amps.

JLCPCB stencil order form showing framework, nano-coating, thickness, and electropolishing settings JLCPCB 2D barcode and serial number order form